51
8.
So for the examination of the substrata
having disclosed a
favourable to
formation infinitely
more
economy of cost than I could
in ordinary prudence have allowed myself to
hope for
in
framing preliminary estimates, I
with this new light before
have
hesitation in
adopted.
now
elating that com
in its
me,
tto
if it had been
original integritif the Zytai
twenty five mountain streams and
service reservoir.
10.
building
If therefore the Colonial Government
adheres to the opinion that a reduced allowance
water is better than
better than a continuance of the
of water
actual condition of things, I have no
Pro
Cost
of
-ject would not have evet the amount at which
it was
valued in the approximate figures of my
preliminary report.
9
If therefore to the reduced cost of the
original project we
now
apply the different.
deductions corresponding
curtailments
or amended
to the alternativo.
designs described
paragraphs 5, 6. and of we will be still
further casing
the total amount, by such sums as it 133,815 the price of
servoir or
a
a dam and re-
by 1⁄2 351004 the price of utilizing
Ao
my ability to bring
mis
downe the
such a reduced provision to proportions
within the resources of the Colony.
Itutit the detail
and estimated
surveyo
are placed before His Excellency the Governor
in Council it will be impossible to determine
which
of
of
the
the three expedients
original design,
or curtailments
design, it will be best to
The present sup-
adopt, by way of mireasing
ply, but in
the meantime, looking
to the great
delays
which
ard
arising from
the absence
of
adequate professional help, His Excellency.
the Governor
may perhaps deem it desirable